Build a communal tap stand by pouring a concrete pad 1.5 m × 1.5 m and 10 cm thick, sloped 2% away from the tap on all sides, setting a vertical pipe 50 cm above the pad in the concrete and connecting it to the supply pipe below, then fitting a tap and cutting a channel from the pad edge to a soakaway pit 1 m × 1 m × 1 m filled with rocks. The pad takes 0.225 m³ of concrete.

A standpipe is a vertical pipe with a tap, set in a concrete pad, from which a community collects water. The pad, the drain and the soakaway keep the ground around it clean and dry.

The Pad And The Drain Matter As Much As The Pipe

A tap alone, set in bare ground, quickly sits in a puddle. Concrete under the user’s feet and a fall toward a drain keep the area firm and clean. The soakaway carries the spill away from the tap and away from any well.

What You Need

  • Cement, sand and gravel for 0.225 m³ of concrete
  • A vertical pipe, galvanized or PVC, long enough to rise 50 cm above the pad and connect below
  • A tap (Tap Types)
  • Formwork for the pad edges
  • Rock to fill the soakaway, and a pipe or open channel from the pad to it
  • A level and a straight board

Method: Pit, Pipe, Pad, Tap, Drain

Step 1: Excavate and prepare the base. Dig the shallow pad area and the soakaway pit; compact the pad base.

Step 2: Connect the supply pipe and set the vertical pipe so its top will be 50 cm above the finished pad. Brace it plumb.

Step 3: Pour the pad, 1.5 m × 1.5 m and 10 cm thick, with the surface sloping 2% away from the tap on all sides. Use the board and level to set the fall.

Step 4: Cure it damp for several days (Curing).

Step 5: Fit the tap, with a valve upstream so you can isolate it for repair.

Step 6: Build the drainage channel from the pad edge to the soakaway, and fill the pit with rocks, covering it with flat stones.

Worked Example

Pad volume = 1.5 × 1.5 × 0.10 = 0.225 m³, which is 225 L of concrete.

A 2% slope falls 2 cm per metre. If the tap is at the centre, the pad edge is 0.75 m away, so it is 0.75 × 0.02 = 0.015 m = 1.5 cm lower than the tap’s foot. If the tap is on one edge and the water drains to the opposite edge, the fall over 1.5 m is 1.5 × 0.02 = 0.03 m = 3 cm. The soakaway pit is 1 m³; the rocks leave only part of that as open space (Soakaway).

Common Mistakes

  • A pad that slopes toward the tap or is flat. Water pools around the pipe.
  • A pipe not braced while the concrete sets. It leans and stresses the joint below.
  • No valve ahead of the tap. Every repair then shuts the branch.
  • The tap spout too low or too close to the ground. Dirty containers touch it. Keep the spout well above any container’s rim.
  • A soakaway next to a well or latrine.

Safety

Wet concrete and a pipe under pressure

Wet cement burns skin and eyes; wear gloves and eye protection. Do not connect the standpipe to the live line without closing the valve upstream first, and release the pressure before you work on any joint.