Relay planting means sowing or transplanting the next crop into a bed while the current crop is still standing, so the successor is already established when the first is cleared. It works only if the successor tolerates the shade and root competition of the standing crop and if you can harvest the first crop without trampling the second. Count back from the date you will clear the first crop by the number of days the successor needs to reach transplant size.

Relay planting is the overlap of two crops in one bed, with the second started under or beside the first shortly before it is finished, so the ground is occupied through the changeover.

The Overlap Saves Weeks At The Season’s Edge

The carrier guide (Four-Season Growing & Season Extension) says August is the most important month for four-season growing, because winter greens, carrots and turnips sown then are the only fresh food from November to March, and that late July and August are the most labour-intensive period because summer crops are still being harvested while the winter garden is established. Relay planting is a way to start the winter crops while the summer crops still stand, instead of waiting for the beds to clear.

What Makes A Relay Work

  • Shade tolerance. The successor starts under the first crop’s canopy. Leafy crops, such as lettuce and spinach, tolerate more shade than root crops.
  • Water. Both crops draw from the same soil; the seedlings need steady moisture while the older crop is drawing hard.
  • Timing. The successor must be big enough to compete when the first crop is cleared, but not so big that it is stretched and weakened beforehand.
  • Harvest access. Picking the first crop must not crush the second.
  • Disease. If the first crop has a disease, a seedling beneath it is exposed; avoid pairing close relatives.

Worked Example: Dates

Illustrative: summer beans to be cleared on 1 September; the successor (a hardy green) needs 4 weeks to reach transplant size in a nursery bed or 3 weeks to establish when sown in place. Sow the successor 4 weeks × 7 = 28 days before clearing, on 4 August. Both numbers are placeholders. Replace them with your own records.

Method

Step 1: Choose the pair. A tall, light-casting or early-ending first crop and a shade-tolerant, quick-establishing second crop.

Step 2: Sow or transplant the successor in the gaps or beside the rows of the standing crop.

Step 3: Water the seedlings by hand or drip so they do not depend on rain.

Step 4: Harvest the first crop carefully and clear residue quickly; leave roots of beans in the soil to decay and feed the next crop.

Step 5: Thin and weed the successor as soon as it is in full light.

Diagnosing Problems

  • Thin, pale successor — too much shade for too long; sow later or clear sooner.
  • Successor wilting — competition for water; irrigate.
  • Disease on the successor — it picked up disease from the standing crop.

Common Mistakes

  • Starting too early — stretched seedlings fail.
  • Starting too late — no advantage over sowing after clearing.
  • Pairing members of one family — pests move across.

What’s Next